Resistive Pad Chambers Detector

Description

PHENIX RPC gas system was designed in 2009. Slow control for the gas system was produced and installed at PHENIX experiment in 2009, along with all necessary wiring between slow control system, gas rack and detector area. Slow control system is based on two DAQ32 modules.

Documents

Electronic rack wiring diagram Electronic rack wiring diagram
DAQ electronics wiring diagram DAQ electronics wiring diagram
Gas rack wiring diagram Gas rack wiring diagram
Three IR detector parts wiring diagram Three IR detector parts wiring diagram

Pictures

Electronic rack Electronic rack
DAQ electronics DAQ electronics
Working and spare DAQ modules Working and spare DAQ modules
Power supplies Power supplies
Gas rack TBs Gas rack TBs
North TBs North TBs
North TBs covered North TBs covered
South TBs South TBs
South TBs covered South TBs covered
Station1 TBs Station1 TBs
Station1 TBs Station1 TBs (new)
Station1 TBs Station1 TBs location

Tags: