Photo archive: Root / MuSun / 2012 / TPC


Back


 

almost ready for vacuum

new cables for the new preamps

 

 

new layout of the new preamps

extracted wires at the grid frame

 

 

new preamps signal connection

 

field cage installed

 

 

 

1st version of preamp layout

 

from the muon point of view :)

 

renovated wire grid

 

 

muon traces at the grid :)

 

new preamp box

base of the TPC assembled

New silver pad plane

 

new holding frame for all cables

temperature sensor at preamp box

HV cable gap

Scripts (c) P.Kravtsov, A.Zamolotskih, 2002-2007.