Beam_area

TPC


Filled cartridges with Zeolite

Dust in the 1st liquid nitrogen volume

Holder for temperature sensor at preamp box

New temperature sensors support

 

CHUPS schrot

All valves assembled and tested

 

 

Grids fixing in compressor column

New temperature sensors
Column 3

New heaters for cold pipes

New compressor piping

Dust in nitrogen MFC

Tuning of the new compressor control

Zeolite cartridges assembly

 

Disassembled compressor unit

First grid at the carbon

Pipe insertion for Compressor LN2 volume

Soldering of the pipe insertion into bottom of the LN2 volume

New temperature sensors
Column 2

 

Improved vacuum system

New pneumatic controllers assembly

Bypass sampling line

 

Disassembled CHUPS stand

 

 

CHUPS assembled, leaktested and pumped

Assembling of the Compressor unit

New temperature sensor
(inside Column 3)

 

Compressor unit is ready

 

Compressor column filling

New temperature sensors
Column 1

Aalborg MFCs switched to valves

Working place

Last grid at the carbon

 

 

New CHUPS stand

Zeolite cartridges